Wearing Carharts, heavy winter coats, and gloves the Breiter men worked in a house with no heat or insulation.  The temperatures inside were only 10-15 degrees above the outside temps, but that didn't stop progress.  Jared and Tom worked on the electrical systems and "helped" our friend Matt with the plumbing.  Meanwhile, the mechanical team took advantage of the "warm" basement for a few days by installing the duct work and furnace.




Check out the tidy wiring

The entertain center recessed box. Everything will feed through the wall, so no more wire mess for us.


Pig tails are ready to be trimmed, prepped, and stuffed into the box for inspection

Conduit for electric tile heat in the bathroom

Plumbing for the first floor bathroom

Plumbing for the washer and laundry sink



Alden's bathtub

On one of the warmer days, Alden came over to help for a few minutes.  He stayed toasty warm in his snow suit.

Jared working in the roof trusses pulling wire

More wire pulling in the trusses.  He's very agile up there.

Scarlet inspecting the basement  on her first (and only) visit to the new house. As a gift, she pooped on the floor. 

Concrete guy laying poly before he pours the basement floor

This is how the family looked after Alden's first Ohio State vs Michigan football game.  Alden's sleeping, but we're happy to have the W.  Go Bucks!